
Pre-Installation
Tylor and Ashlee's sump pump and basement floor before the installation.

Breaking Out of Concrete
Our Foreman, Edgar, broke out the concrete with a jackhammer and formed a trench.

Installation of Feed Line and Filling of Rock
Our crew installed a 26-foot-long feed line and covered the open gaps with rock.

Post-Installation
Edgar and his team applied new concrete, leaving the basement looking cleaner than when they found it.