
Pre-Installation
Rod B. had cracked foundation walls in his basement, making him worry about the life and stability of his home.

During Installation
Our Foreman, Juan Pena, and his production crew dug six holes in his backyard to begin the project.

During Installation
Next, our crew inserted a long, medal rod from the inside foundation wall to each hole outside of the home. Our team tightened and screwed on a GeoLock Wall Anchor to the ends of each rod to straighten the wall to its normal position.

Post-Installation
Rod was happy with the project, and his peace of mind is restored!