Beginning of Installation
Geno drilled a hole in the sump pump to provide a suction point to suck the radon out from underneath the ground.
Installation of Mitigation System
Dakota connected more PVC from the second floor and guided it up to the attic, where he installed our Radon Mitigation System Airflor Fan. The black pipe attached to the system is called a "water stopper." This is made to keep water out of the system.
End of Installation
Our team installed a roof flashing on the roof (the back surrounding the PVC pipe) which keeps any penetration from invading the piping. Tiffany and Dusty were happy with the work that was done!
UTube Reading
The red tube is called the UTube. The purpose of this is to see if your pressure levels are correct. If each side is even, the pressure isn't working correctly. If each side is lopsided (as shown), the pressure is doing what it's supposed to be doing. The Foreman will discuss this with the homeowner after the installation is complete, when they do the walkthrough.